St Agatha Secondary school Rain water harvesting by construction of 400 square meter farm pond (excavations – Kshs.100,000, supply and installation of 0.75mm HDPE liners – Kshs. 400,000, Solar water pump – Kshs. 50,000, purchase of 10,000ltrs tank – Kshs100,000, Construction of a tank base – Kshs. 50,000)
Mbela Secondary School Rain water harvesting by construction of 400 square meter farm pond (excavations – Kshs 100,000, supply and installation of 0.75mm HDPE liners – Kshs 400,000, Solar water pump – Kshs 50,000, purchase of 10,000l tank – Kshs 100,000, Construction of a tank base –Kshs. 50,000)
Paranga Secondary School Rain water harvesting (Guttering – Kshs 50,000, purchase 10,000litres water tank -Kshs 100,000, Construction of tank base – Kshs 50,000)
Mworoko Primary School Rehabilitation of 8 classrooms and administration block (Roofing and ring beam, flooring, painting, electrical)
Shagha Primary School Construction of 4 classrooms
Kimangachughu Primary Electrical works in 8 classrooms
Mkanyatta Primary School Construction of two door girl’s toilet – 500,000, Purchase of 80 desks – Kshs 400,000 and staffroom furniture (worktop,4 chairs and table – Kshs 100,000 , Electrical works – 200,000
Kidule Primary School Rehabilitation of 8 classrooms and administration block (Flooring, painting, electrical Fencing
St. Peters Ikuminyi Primary School Rehabilitation of 4 classrooms (Roofing, Flooring, painting – electrical Kshs 1,500,000: Construction of a 2-door toilet Kshs 500,000
Shigharo Primary School Construction of one classroom
Mlechi Primary School Rehabilitation of 4 classrooms (Roofing, Flooring, painting)
Dr.  Aggrey Secondary School Construction of 3 classrooms
Wumingu Technical Training Institute Construction of a two-bedroom staff house
Wundanyi OCPD resident Renovation of OCPD resident (roofing, windows and doors, finishes and fixtures)